Australia Ph: (03) 9852 0411   International Ph: +61 2 8625 4531   Ultralast Australia Pty Ltd

Surface Preperation - Concrete

The Putty surface you are working with may have to be treated differently depending on its current state.

New / unpainted

For optimal results on a Putty surface in a New / unpainted state, please follow the instructions below for preparation and application. Links to the products utilised in this guide are listed below.

Preperation
  1. Putty must by dry for at least 7 days
Application
  1. Apply 1 coat Ultra-Bond
  2. Apply 2 coats of Ultra-Coat
Products used
Previously painted

For optimal results on a Putty surface in a Previously painted state, please follow the instructions below for preparation and application. Links to the products utilised in this guide are listed below.

Preperation
  1. Remove loose flaking paint by steel brushes or sanding
  2. Wash down with G.P. Cleaner
  3. Rinse with clean water
  4. Cracks can be filled with a filler and Bind (in place of water)
Application
  1. Apply 1 coat Ultra-Bond
  2. Apply 2 coats of Ultra-Coat
Products used